Installation progress at Maiti Nepal, Kathmandu

26 January 2012, Kathmandu – The women and Children at the rehabilitation center of Maiti Nepal, an organization helping rescue women and children from trafficking, are one step closer to living in light even during load shedding hours. Gham Power has already finished installing the panels, the combiner box  and completed the inverter box arrangement at Maiti Nepal.

The 45-panels of 185 watts each from Gham Power installed at Maiti Nepal

Maiti Nepal had reached out to Gham Power for solar electricity to power up lights in every room for their dormitory as well as for the activity areas, outdoors and in the office. The solar electricity will also be used to power up the office equipment during load shedding hours. The installation started in December 2011 and is expected to complete in January 2012.

Gham Power's 8.33 KW PV system atop Maiti Nepal Office

Technicians setting up the frame for the panels

Arranging the wires from the panel to the battery station

The wire channel

setting up the charge controller-inverter hub

filling acid into the battery array

We had earlier posted the news of Gham Power being tapped for solar electricity by Maiti Nepal. http://ghampower.com/2012/gham-power-ready-to-bring-light-to-maiti-nepal/

Facebook comments:

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>